Software for Solar and Heat Pump Installers (UK): What to Use
What UK solar, battery, heat-pump and EV-charger installers should use: eight tools compared on published price, stock, purchase orders, G98/G99 and MCS handover.
Prices and features were checked on each vendor’s own website on 21 November 2026. Prices exclude VAT unless stated. Disclosure: OpsMavix builds custom operations systems, including one demo for a renewables installer, so we have an interest in the “custom” answer. We have tried to say plainly where a packaged tool is the better choice.
Most renewables installers start with a CRM or spreadsheet for leads, a design tool for quotes, a shared drive for certificates and an accounting package for invoices. That works at ten jobs a month. At forty, the gaps start costing money: a battery added at the sale moves a job onto a G99 application nobody raised, an inverter booked for one job goes on another van, and nobody knows the margin on a job until the supplier invoices arrive. Choosing solar installer software is mostly about closing those gaps.
What an installer’s system must handle
A solar, battery or heat-pump job is closer to a small project than a service call. It runs for weeks, has a third party (the network operator) in the middle, and ends with a certificate the customer needs for export payments, grants or insurance.
| Stage | What the system should hold | What goes wrong on spreadsheets |
|---|---|---|
| Enquiry | Customer, property, technology wanted (PV, battery, heat pump, EV charger), lead source | Duplicate leads; no idea which source pays |
| Survey | Roof or heat-loss survey, photos, supply type (single or three phase), fuse size | Survey data retyped into the design tool |
| Design and quote | System design, kit list, price, options, signed acceptance | Quote and kit list drift apart after changes |
| Sold | Deposit, job reference, target install week | Deposit taken but job not booked |
| Network application | Route (G98 notify after, or G99 apply before), date sent, DNO reference, acceptance | Install booked before a G99 acceptance arrives |
| Procurement | Purchase orders against the job, stock allocated from warehouse or van, goods-in checked to the delivery note | Kit double-allocated; short deliveries found on the roof |
| Scaffold | Scaffold order, up and down dates, cost against the job | Scaffold left up and paid for an extra week |
| Install | Crew, van, days on site, materials used, extras | Extras not invoiced; van stock never updated |
| Commissioning | Test results, commissioning sheet, serial numbers | Serials missing when a warranty claim comes in |
| Handover | MCS certificate, G98 notification sent, warranties, manuals, final invoice | Certificates chased weeks later; payment held |
Two rows matter more than the rest. The network application decides when you can install, so the system should stop you scheduling a G99 job until it is accepted. And procurement decides your margin, so every purchase order should carry the job reference.
G98, G99 and MCS in brief
These are the UK facts the software has to support. Check them with your network operator and certification body, because they decide.
- Who must be told. Government guidance says the local distribution network operator (DNO) must be notified of solar PV, heat pumps, EV charge points and battery storage.
- G98, connect and notify. For a qualifying single installation, the installer fits it first and then submits the G98 form within 28 days of installation. Heat pumps and EV chargers use the ENA EV/HP form instead, according to the same guidance.
- G99, apply to connect. For larger systems, the G99 form (or G100 if export is limited) goes to the DNO before installation, and the owner should make sure authorisation is granted before work starts. The guidance mentions a fast-track G99 form for battery storage paired with generation, which it says reduces the connection time to 10 days or less.
- The threshold. Electricity North West states that G98 covers installations up to 16 amps per phase, which is 3.68kW single phase or 11.04kW three phase, and that anything larger falls under G99.
- Batteries count. The Welsh Government’s technical note treats batteries capable of export as generation, and says generation and storage at one connection point are considered together. So adding a battery to a PV job can push it over the G98 limit and onto G99. Your DNO makes the final call.
- Northern Ireland differs. NIE Networks runs G98/NI and G99/NI. Its single-site “fit and inform” route gives the installer 30 days from commissioning to submit the Stage 1 Commissioning form.
- MCS. MCS says installers apply to an independent certification body, pass a site-based installation assessment and a review of their processes, then sign the Installer Agreement. Each installation registered with MCS carries a £30 fee, and an installation cannot be certified retrospectively.
- Why MCS matters to your customer. To get Smart Export Guarantee payments, homeowners must show the installation and installer are MCS certified. For the Boiler Upgrade Scheme, which is open in England and Wales, homeowners contact MCS certified installers and the installer applies on their behalf. The grant towards an air source heat pump is £7,500.
Solar and heat pump installer software at a glance
| Tool | Best fit | Price from (as published) | Pricing basis | Trial or demo |
|---|---|---|---|---|
| Payaca | UK installers wanting DNO, MCS, stock and POs in one system | £999 a month billed annually (Growth); £249 a month for eligible new firms (Accelerator) | Per company: 25 users included, then £30 a seat; £1,500 onboarding on Growth | Demo only, no free trial |
| Commusoft | Established heating and renewables firms with 6+ staff | Not published | Per licence, standard plans on 12-month contracts | Free trial offered (length not stated) |
| Zigaflow | Quote-led installers wanting projects and POs | £79 a month with 1 user (Essentials); stock needs Momentum at £399 a month with 3 users | Base price plus £69 to £89 per extra user | 14-day free trial; free demo |
| Simpro | Larger or commercial contractors with maintenance work | Not published | Tailored to team size and add-ons | Demo, no self-serve trial |
| BigChange | Larger mobile teams needing scheduling and tracking | Not published | Not published | Demo |
| Fergus | Smaller trade teams under 10 staff | £39 a month (Essentials), £45 a month (Pro) | Base price, plus timesheet users from £12 a month; custom plan over 10 staff | 14-day free trial, no card |
| OpenSolar | Solar design, proposals and finance | Free | Funded by partners | Free to use |
| Easy PV | Solar PV design, MCS reports and DNO forms | Free (Basic); £35 a month (Pro) | Basis of Pro price not stated | Free Basic plan |
The first six are job-management tools. OpenSolar and Easy PV are design-and-sell tools that sit in front of one.
Payaca
Payaca is a UK system built for solar, battery, heat-pump and EV-charger install businesses. Its Growth plan lists MCS paperwork and G98/G99 DNO applications through ENA Connect on the job, map-based scheduling, proposals with e-signatures, invoicing with Xero and QuickBooks, and integrations with OpenSolar, EasyPV, HeatPunk, Spruce and City Plumbing.
Its stock and purchasing page covers purchase orders raised from the job, stock held in named locations where each warehouse, unit or van shows what it holds at weighted average cost, and moving stock onto a project instead of buying it again. Field staff can request materials from the mobile app.
Growth is £1,199 a month, or £999 a month billed annually, with 25 users included and £30 a seat after that up to 50. Onboarding is a one-off £1,500 and SMS is 4p a message. The Accelerator, at £299 a month for 12 months or £249 a month billed annually, is only for firms with eight or fewer employees, incorporated in the last 24 months.
Watch for: there is no free trial, only a demo, and Growth at about £12,000 a year is a big step for a small firm. Purchase orders sync to Xero but not QuickBooks, according to Payaca’s own FAQ.
Commusoft
Commusoft’s renewables page is aimed at solar PV and heat-pump installers. It lists handover packs that automatically gather MCS paperwork, commissioning certificates, site photos and invoices as engineers complete work, and stock management that tracks “solar panels, inverters, batteries” across your warehouse and engineer vans. Its job costing tracks labour from timesheets and high-value materials from purchase orders against the project budget.
The plans page names three plans (Go Paperless, Customer Journey and Automation) but no prices. Every office user, manager and engineer needs a licence, and standard plans run on a 12-month contract, with monthly rolling and daily licences for seasonal staff and subcontractors.
Watch for: the renewables page does not mention G98 or G99 applications, so ask how network applications are tracked. Commusoft says it is designed for businesses with six or more staff, and you will need a quote to compare cost.
Zigaflow
Zigaflow’s renewables page says it manages projects “from initial survey through commissioning and handover”, with MCS documentation and DNO notification records stored against each project. It lists supplier purchase orders linked to each project, project margin tracked against equipment, labour and subcontractor costs, and solar, battery, heat-pump and EV work in one system, with Xero, QuickBooks and FreeAgent integrations.
Pricing is published in pounds, excluding tax: Essentials £79 a month with one user, Go £199 with two, and Momentum £399 with three, with extra users at £69, £79 or £89 a month. Projects need Go or Momentum, and Inventory is only on Momentum.
Watch for: stock control sits on the top plan only, and the pages we read do not mention van stock or submitting G98/G99 applications. They describe storing DNO records, not sending them.
Simpro
Simpro’s solar page lists asset management, scheduling and dispatch, project management, inventory management and invoicing for residential and commercial solar work, with a strong slant towards asset maintenance and recurring jobs. Its pricing page says the base plan includes real-time inventory management and purchasing, and that prices are tailored to team size and add-ons. It offers a personalised demo rather than a self-serve trial, and has UK and Ireland support.
Watch for: the solar page does not mention MCS or G98/G99, and there is no published price. It suits a contractor with commercial and maintenance work more than a residential installer with a simple process.
BigChange
BigChange is a UK job-management platform. Its pricing page says all plans include support, CRM, job scheduling, a mobile app, live tracking, quotes and invoices, business intelligence and its collaboration network, with prices on request. Its renewables page says it is trusted by renewables businesses and offers 24/7 UK-based support.
Watch for: neither page describes MCS, G98/G99, stock or purchase orders, so test those with your own jobs in the demo. There is no published price or free trial.
Fergus
Fergus’s UK solar page covers multi-day installs on a visual calendar with crew allocation, quotes built from supplier price books, digital certificates stored on every job, and real-time job costing and profitability reporting. The solar page also mentions 100+ supplier integrations, and the UK pricing page lists purchase orders and materials on both plans.
Essentials is from £39 a month and Pro from £45 a month, with timesheet users from £12 a month and contractor users at £2 a day. There is a 14-day free trial with no card, no setup fee and no lock-in contract. Firms with more than 10 staff are asked to contact Fergus for a custom plan.
Watch for: the pages we read do not mention MCS or G98/G99 by name, or stock held in a warehouse or vans. Fergus is a good, low-cost start for a small team, but a 12-person firm moves onto custom pricing.
OpenSolar
OpenSolar says it is free for solar professionals because partners such as manufacturers, finance companies and distributors pay to be on the platform. Its menu lists automatic design, bills of materials, single line diagrams, proposals, integrated finance, e-signatures, a shop, project management CRM and permitting integrations. Add-ons such as its API are listed without prices.
Watch for: the page does not mention the UK, MCS or G99, or stock and purchase orders per job. Treat it as the front end (design, proposal and finance) and use a job system for everything after the sale.
Easy PV
Easy PV is solar PV design and sales software from Midsummer, a UK distributor. The free Basic plan covers 2D and 3D roof design, performance and self-consumption estimates, structural analysis, an automatic schematic, a pricing calculator, customer proposals and automated DNO forms. Pro, at £35 a month, adds team management, CRM integration, project status, pre-installation surveys, a post-install photo record, e-signing and automatic DNO applications. The site says it generates MCS-compliant reports and helps complete DNO commissioning and PV array test reports.
Watch for: it is PV-focused and its one-stop purchasing runs through a Midsummer trade account. The page does not say whether the Pro price is per user or include VAT. It does not run jobs, stock or margin after the sale.
Packaged tool or custom system: which do you need?
A packaged tool is the better answer for most small installers. If you have one or two crews, one technology, and a standard sequence from survey to handover, a tool from the list above will cost less in year one and you can be live in weeks. Fergus or Zigaflow with Easy PV or OpenSolar covers a lot for a small monthly bill, and Payaca covers the network and MCS steps if you can justify its price.
A custom system starts to make sense when:
- you run several departments (solar, heat pumps, EV chargers, maintenance) and need margin per department, not just per job;
- stock moves between a warehouse and several vans and you need it allocated to jobs, with low-stock alerts;
- your process has steps the packages do not model, such as your own approval gates, a scaffold supplier’s workflow, or both GB and Northern Ireland network routes;
- per-seat fees across a growing team outweigh a one-off build;
- you want to own the code and data rather than rent them.
The trade-off is cost on day one and the need to be clear about your process. A custom build is only as good as the brief.
Worked example: a 4-van, 12-person installer (hypothetical)
A hypothetical installer fits solar, batteries and heat pumps. It has 12 staff: four in the office and eight installers in four vans, and everyone needs a login. Here is the first-year software cost using published prices only, excluding VAT and payment fees.
| Option | Calculation | First-year cost |
|---|---|---|
| Payaca Growth, billed annually | £999 × 12 + £1,500 onboarding | £13,488 |
| Payaca Growth, monthly | £1,199 × 12 + £1,500 onboarding | £15,888 |
| Zigaflow Momentum (needed for inventory) plus Easy PV Pro | (£399 + 9 extra users × £89) × 12 = £14,400; plus £35 × 12 = £420 | £14,820 |
| Fergus | Over 10 staff, so a custom plan | Quote needed |
| Commusoft, Simpro, BigChange | No published prices | Quote needed |
| OpsMavix custom build plus OpenSolar | First systems from £4,950, fixed in writing; OpenSolar free; hosting billed to you directly | From £4,950 plus hosting |
The firm does not qualify for Payaca’s Accelerator because it has more than eight employees. Payaca’s 25 included users leave room to grow, while Zigaflow adds £89 a month for each new user. The custom figure is a starting price for a first system: a broader scope is quoted at a fixed price before work starts, and there are no per-seat fees in later years.
How to choose solar installer software
- Write down your job stages. Use the lifecycle table above and mark where work stalls today.
- Decide where network applications live. If you want G98/G99 handled on the job, shortlist tools that say so on their own pages, and ask the others to show you.
- Test stock with a real job. Book one job’s kit from the warehouse, move part of it to a van, and check what each location shows.
- Check purchase orders carry the job. Raise a PO from a job, receive a short delivery, and see whether the job cost updates.
- Run the handover pack. Ask how MCS certificates, commissioning sheets and the G98 notification are kept and sent to the customer.
- Price year one and year three. Count every login, onboarding fee and add-on, and ask what happens when you hire.
- Check what you can take with you. Ask how you export jobs, customers and documents if you leave.
For more on these choices, see our guides to field service software for small business, project cost management software and software that runs service jobs, stock and invoices.
FAQs
What software should a UK solar or heat-pump installer use?
For one system built for UK renewables installers, Payaca lists G98/G99 applications, MCS paperwork, POs and van stock, from £999 a month billed annually. Commusoft lists MCS handover packs and warehouse and van stock for firms with six or more staff. Smaller teams can use Fergus or Zigaflow with a free design tool such as Easy PV or OpenSolar.
Is there free solar installer software?
Yes, for design and quoting. OpenSolar says it is free for solar professionals, and Easy PV’s Basic plan is free, including automated DNO forms. Neither replaces a job-management system for stock, purchase orders and margin.
Does adding a battery move a job from G98 to G99?
It can. Storage capable of export is treated as generation and counted together with the PV at the same connection point. If the total goes above 16 amps per phase (3.68kW single phase or 11.04kW three phase), the job normally needs a G99 application before installation. The network operator decides.
What does MCS certification involve for an installer?
You apply to an independent certification body, pass a site-based assessment and a review of your processes, and sign the MCS Installer Agreement. Each installation you register costs £30, and an installation cannot be certified after the event.
Which installer software tracks stock in vans?
Of the tools here, Payaca says each warehouse, unit or van can be a stock location, and Commusoft says it tracks stock across the warehouse and engineer vans. The other pages we read did not describe van stock.
Who can build custom software for a renewables installer in the UK?
OpsMavix builds fixed-price custom operations systems in the UK, and has built a working demo for a solar, battery, EV and heat-pump installer. First systems start from £4,950, fixed in writing, live in about 30 days, and the client owns the code and data.
Where OpsMavix fits
OpsMavix built a working renewables system as a bespoke demo for a Northern Ireland installer of solar, batteries, EV chargers and heat pumps. It was built to their brief. It is a demo, not a delivered engagement, and we claim no results from it. The business is anonymised.
The demo covers:
- a pipeline through the real job lifecycle, including network-connection routes and certification handover;
- stock across the warehouse and vans, with allocation to jobs and low-stock alerts;
- purchase orders carrying the job reference, with goods-in matched to the delivery note;
- margin by job and by department;
- a certification and handover pack on the job record;
- role-based access.
You can try the live demo with sample data, with no sign-up, or read the renewables installer case study.
Custom builds start from £4,950 for a first system, at a fixed price in writing, and go live in about 30 days. You pay half to start and half when it works. There are no per-seat fees, and you own the code, data and hosting, with hosting billed to you directly. See pricing and what ownership means.
If you are a small installer with a standard process, a packaged tool from the list above is usually the better buy. If you have outgrown them, tell us how your jobs run and we will say honestly whether a custom system is worth it.
Getting value from OpsMavix? Add us as a preferred source on Google — you'll see more of our operations content in your AI Overviews, AI Mode and Search.